Barrington Elementary School Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Barrington Elementary School, located at 400 Cooper Dr., in North Austin, was built in 1969. A full modernization project is typically the whole or selective demolition of an existing facility, and new construction that must be designed in compliance with Austin ISD Educational Specifications and the Project Development Manual. This is an occupied campus that may require onsite swing space.
- Status
- Closed
- Sector
- Education, Government, Commercial
- Location
- Austin, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Barrington Elementary School Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Sub Bidding, Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Barrington Elementary School, located at 400 Cooper Dr., in North Austin, was built in 1969. A full modernization project is typically the whole or selective demolition of an existing facility, and new construction that must be designed in compliance with Austin ISD Educational Specifications and the Project Development Manual. This is an occupied campus that may require onsite swing space. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Austin |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Education, Government, Commercial |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
