logo

Barro Alto Solar Complex (452MW)

Sector: Solar • Location: Brazil

Source: World Bank Group

Project
Active

"The Barro Alto Solar Complex project is being developed in the central region of Goiás state, Brazil. Spanning an 800-hectare area, the park will feature 731,000 solar panels with a planned generation capacity of 452 MWp. The initiative is sponsored by Newave Energia, a joint venture between Gerdau SA, a local steel producer, and Newave Capital, an investment manager specializing in Brazil's dome

Project Information FAQ

Project Information

4 Q
The project “Barro Alto Solar Complex (452MW)” is an infrastructure initiative in the Solar sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

"The Barro Alto Solar Complex project is being developed in the central region of Goiás state, Brazil. Spanning an 800-hectare area, the park will feature 731,000 solar panels with a planned generation capacity of 452 MWp. The initiative is sponsored by Newave Energia, a joint venture between Gerdau SA, a local steel producer, and Newave Capital, an investment manager specializing in Brazil's domestic electric sector. The Barro Alto Solar Complex will generate enough electricity to meet the needs of approximately 365,000 residents. Once operational, it will supply 66% of the renewable energy required for Gerdau’s steel production facilities in Brazil, while the remaining 34% will be sold in the country's free market. The project, with a total cost of $239 million (R$1.3 billion), is financed through equity contributions from the sponsors and a loan from Banco do Brasil’s SUDECO funding. Construction began on December 11, 2024." https://yieh.com/en/NewsItem/151743 ; https://www.steelorbis.com/steel-news/latest-news/brazils-gerdau-to-begin-construction-of-barro-alto-solar-park-1369586.htm ; https://list.solar/news/goias-greenlights/ ; https://renewablesnow.com/news/brazils-newave-energia-to-build-452-mwp-solar-farm-in-goias-state-870165/

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data