Barrow Green Hydrogen Project
Final investment decision · Cumbria · Last reported May 2026
Source: Investing.com Canada
The 30-megawatt Barrow Green Hydrogen project in Barrow-in-Furness, Cumbria, UK, involves the supply of 30 MW of GenEco Proton Exchange Membrane electrolyzers by Plug Power. The project will produce approximately 100 GWh of green hydrogen annually to supply Kimberly-Clark's manufacturing plant, reducing natural gas consumption by up to 50% and cutting CO2 emissions by 18,300 tonnes. It is delivere
- Status
- Prospective
- Sector
- Natural Gas, Hydrogen, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Barrow-in-Furness, Cumbria, United Kingdom
- Updated
- 22 Jul 2026
- Source
- Investing.com Canada
ConstructChat
Ask ConstructChat about Barrow Green Hydrogen Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | final investment decision |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 30-megawatt Barrow Green Hydrogen project in Barrow-in-Furness, Cumbria, UK, involves the supply of 30 MW of GenEco Proton Exchange Membrane electrolyzers by Plug Power. The project will produce approximately 100 GWh of green hydrogen annually to supply Kimberly-Clark's manufacturing plant, reducing natural gas consumption by up to 50% and cutting CO2 emissions by 18,300 tonnes. It is delivered by Green Hydrogen Energy Company, a joint venture between Schroders Greencoat and Carlton Power, and supported by a long-term power purchase agreement with SEFE for renewable electricity. |
Original sector | Energy Transition |
Location
Country | United Kingdom (UK) |
State | Cumbria |
City | Barrow-in-Furness |
Source
Source | Investing.com Canada |
URL |
More Details
Record type | Project |
Sector | Natural Gas, Hydrogen, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2026-05-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
