logo
ProjectUnder Construction

Barrow Green Hydrogen Project

Under construction · Cumbria · Last reported May 2026

Source: Fuel Cells Works

The Barrow Green Hydrogen project is a 30 MW renewable hydrogen production facility in Barrow-in-Furness, Cumbria, UK. It will supply approximately 100 GWh of green hydrogen annually to Kimberly-Clark's manufacturing plant, reducing natural gas consumption by up to 50% and cutting CO2 emissions by 18,300 tonnes. The project uses six 5 MW Plug Power GenEco PEM electrolyzers powered by renewable ele

Status
Under Construction
Sector
Natural Gas, Hydrogen, Power Generation (CCGT), Manufacturing (Industrial), Commercial
Location
Barrow-in-Furness, Cumbria, United Kingdom
Updated
22 Jul 2026
Source
Fuel Cells Works

ConstructChat

Ask ConstructChat about Barrow Green Hydrogen Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Barrow Green Hydrogen Project” is an infrastructure initiative in the Natural Gas sector, located in Barrow-in-Furness, Cumbria, United Kingdom. Taiyo aggregates data on it from Fuel Cells Works.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Barrow Green Hydrogen project is a 30 MW renewable hydrogen production facility in Barrow-in-Furness, Cumbria, UK. It will supply approximately 100 GWh of green hydrogen annually to Kimberly-Clark's manufacturing plant, reducing natural gas consumption by up to 50% and cutting CO2 emissions by 18,300 tonnes. The project uses six 5 MW Plug Power GenEco PEM electrolyzers powered by renewable electricity supplied under a long-term power purchase agreement with SEFE. The project is owned and delivered by Green Hydrogen Energy Company (GHECO), a joint venture between Schroders Greencoat and Carlton Power. Dalkia Engineering is contracted for design, construction, and commissioning services. The project reached Final Investment Decision (FID) in May 2026 and is expected to start commercial operation by 2028.

Original sector

Energy

Location

Country

United Kingdom (UK)

State

Cumbria

City

Barrow-in-Furness

Source

Source

Fuel Cells Works

URL

More Details

Record type

Project

Sector

Natural Gas, Hydrogen, Power Generation (CCGT), Manufacturing (Industrial), Commercial

Article published date

2026-05-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project