Baru-Marnda Wind, Solar and Battery Storage Hybrid Project
Sector: Metal • Location: Port Hedland, Western Australia, Australia
Source: PV Tech
A 1.5GW renewable energy project including 500MW of solar PV, up to 1GW of wind capacity, and an optional battery storage system, developed by Yindjibarndi Energy Corporation (YEC) on Yindjibarndi Ngurra in Western Australia's Pilbara region.
- Status
- Prospective
- Sector
- Metal, Energy Storage, Wind, Solar
- Location
- Port Hedland, Western Australia, Australia
- Updated
- 22 Jul 2026
- Source
- PV Tech
ConstructChat
Ask ConstructChat about Baru-Marnda Wind, Solar and Battery Storage Hybrid Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 1.5GW renewable energy project including 500MW of solar PV, up to 1GW of wind capacity, and an optional battery storage system, developed by Yindjibarndi Energy Corporation (YEC) on Yindjibarndi Ngurra in Western Australia's Pilbara region. |
Original sector | Energy |
Location
Country | Australia |
State | Western Australia |
City | Port Hedland |
Source
Source | PV Tech |
URL |
More Details
Record type | Project |
Sector | Metal, Energy Storage, Wind, Solar |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
