BAS CHELIF I
Sector: Water Supply and Storage • Location: Algeria
Source: World Bank Group
The project is the first stage of an eventual three-stage effort to assist the Government in rehabilitating old and badly damaged irrigation infrastructure, reclaiming lands lost to salinity and rationalizing and developing irrigated agriculture in the Bas Cheliff district. The proposed project would focus on the most urgently needed civil works to ensure the continuation of irrigated agriculture
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Raw Materials, Government
- Location
- Algeria
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about BAS CHELIF I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is the first stage of an eventual three-stage effort to assist the Government in rehabilitating old and badly damaged irrigation infrastructure, reclaiming lands lost to salinity and rationalizing and developing irrigated agriculture in the Bas Cheliff district. The proposed project would focus on the most urgently needed civil works to ensure the continuation of irrigated agriculture on some 4,000 ha in the district, and on measures to improve operations and strengthen maintenance. Studies are included for the preparation of second- and third-stage project which would emphasize respectively: (i) improvements in irrigated agricultural production and reclamation works for some 10,000 ha, and (ii) the construction of water mobilization works and extension of the irrigation network. The project would consist of: (i) the repair of diversion weir, the main and primary canals, sluice gates, pumping stations and an aqueduct; (ii) the reconstruction of part of the primary canal and three aqueducts, the replacement of several sluice and automatic gates and pumping station equipment and the provision of a power supply line; (iii) purchase of maintenance and transport equipment; and (iv) the provision of technical assistance and studies,most of which relate to the prep |
Original sector | Agriculture, Fishing and Forestry |
Location
Country | Algeria |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
