logo
ProjectPlanned

Baseload Renewable Energy System for Kamoa-Kakula Copper Mining Complex

Planned · Democratic Republic of the Congo · Last reported Apr 2025

Source: Global Mining Review

Kamoa Copper SA and CrossBoundary Energy have signed a power purchase agreement to provide baseload renewable energy to the Kamoa-Kakula copper mining complex. This project includes a 222 MWp solar PV system and a 123 MVA/526 MWh battery energy storage system, aiming to supply 30 MW of dispatchable renewable energy, significantly reducing carbon emissions.

Status
Prospective
Sector
Power Generation (CCGT), Energy Storage, Metal, Solar
Location
Kolwezi, Democratic Republic of the Congo
Updated
22 Jul 2026
Source
Global Mining Review

ConstructChat

Ask ConstructChat about Baseload Renewable Energy System for Kamoa-Kakula Copper Mining Complex

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Baseload Renewable Energy System for Kamoa-Kakula Copper Mining Complex” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Kolwezi, Democratic Republic of the Congo. Taiyo aggregates data on it from Global Mining Review.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Kamoa Copper SA and CrossBoundary Energy have signed a power purchase agreement to provide baseload renewable energy to the Kamoa-Kakula copper mining complex. This project includes a 222 MWp solar PV system and a 123 MVA/526 MWh battery energy storage system, aiming to supply 30 MW of dispatchable renewable energy, significantly reducing carbon emissions.

Original sector

Mining

Location

Country

Democratic Republic of the Congo (DRC)

City

Kolwezi

Source

Source

Global Mining Review

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Energy Storage, Metal, Solar

Article published date

2025-04-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project