Baseload Renewable Mauritania
Sector: Road • Location: Mauritania
Source: IFC Project Disclosures
Istithmar West Africa (IWA or the Company), through a project company, is developing a hybrid renewable energy complex in Toujounine, Nouakchott-Nord, Mauritania, under a 15-year public-private partnership (PPP) with the Government of Mauritania. IWA was selected as preferred bidder in a restricted tender in July 2025. The PPP supports the emergency plan to close the short-term generation capacity
- Status
- Prospective
- Sector
- Road, Energy Storage, Wind, Solar, Raw Materials, Government
- Location
- Mauritania
- Updated
- 19 Nov 2026
- Source
- IFC Project Disclosures
ConstructChat
Ask ConstructChat about Baseload Renewable Mauritania
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pending |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Istithmar West Africa (IWA or the Company), through a project company, is developing a hybrid renewable energy complex in Toujounine, Nouakchott-Nord, Mauritania, under a 15-year public-private partnership (PPP) with the Government of Mauritania. IWA was selected as preferred bidder in a restricted tender in July 2025. The PPP supports the emergency plan to close the short-term generation capacity deficit identified in the 2022 Generation–Transmission Master Plan. The complex will be built in two phases on a single site of 1,032 ha, with total installed capacity of about 228 MW. Phase I (the Project) comprises: (i) a 168 MWp solar PV plant; (ii) a 185 MW/370 MWh battery energy storage system (BESS); (iii) a 33/225 kV substation and an approximately 350 m 225 kV overhead line connecting to the SOMELEC grid; and (iv) an approximately 2 km access road from the Rocade ring road. The Project is designed to deliver: (i) a guaranteed minimum output of 60 MW between 09:00 and 17:00, achieved by smoothing PV variability and managing ramp rates; and (ii) evening dispatchable reserve: 60 MW for four hours between 19:00 and 23:00. Phase 2 (the Wind Development), which is not part of this round of IFC financing, comprises a 60 MW wind farm of twelve 5 MW wind turbine generators (WTGs), connected to the Phase I substation through an underground 33 kV collector network. Phase 2 will improve evening supply and optimize overall production cost. |
Original sector | V-BF - Solar - Renewable Energy Generation |
Location
Country | Mauritania |
Source
Source | IFC Project Disclosures |
URL |
More Details
Record type | Project |
Sector | Road, Energy Storage, Wind, Solar, Raw Materials, Government |
Article published date | 2026-10-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project