Bash wind power plant extension
Sector: Wind • Location: Uzbekistan
Source: World Bank Group
This project consists of extension of the Bash wind power plant with additional 52 MW, which is planned to supply a 20 MW green hydrogen production facility in Chirchiq City, Tashkent region, Uzbekistan. The addition support is secured by the European Bank for Reconstruction and Development (EBRD) with $34.2 million financing. Financial close took place on June 25, 2024. Sponsor of the project is
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project consists of extension of the Bash wind power plant with additional 52 MW, which is planned to supply a 20 MW green hydrogen production facility in Chirchiq City, Tashkent region, Uzbekistan. The addition support is secured by the European Bank for Reconstruction and Development (EBRD) with $34.2 million financing. Financial close took place on June 25, 2024. Sponsor of the project is Saudi Arabia's ACWA Power. https://www.ebrd.com/work-with-us/projects/psd/54561.html https://www.ebrd.com/work-with-us/projects/psd/54561.html |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Wind projects in Uzbekistan
- Zarafshon Wind Farm
- Sirdarya CCGT Power Plant Shirin
- Sirdarya combined-cycle gas turbine plant
- Uzbekistan: ACWA Power Renewable Energy Loan (Previously: ACWA Power Sustainable Energy Development Capital Facility)
- Uzbekistan: ACWA Power Renewable Energy Loan (Previously: ACWA Power Sustainable Energy Development Capital Facility)
- Uzbekistan: ACWA Power Renewable Energy Loan (Previously: ACWA Power Sustainable Energy Development Capital Facility)
- Uzbekistan: ACWA Power Renewable Energy Loan (Previously: ACWA Power Sustainable Energy Development Capital Facility)
- Uzbekistan: ACWA Power Renewable Energy Loan (Previously: ACWA Power Sustainable Energy Development Capital Facility)
