Basic Science Building 7 East Lab & Office Renovations
Sector: Raw Materials • Location: Charleston, South Carolina, United States of America
Source: Dodge
Renovation of approximately 1,893 SF of shell space into open lab and freezer farm. Work includes new wood doors,metal frames, walls, ceilings, finishes, and related mechanical, electrical, and plumbing. Alternate 1: Provide and install(1) rooftop exhaust fan in lieu of (2) separate exhaust fans.
- Status
- Under Construction
- Sector
- Raw Materials, Commercial, Residential, Power Generation (CCGT), Metal, Education
- Location
- Charleston, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Basic Science Building 7 East Lab & Office Renovations
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Renovation of approximately 1,893 SF of shell space into open lab and freezer farm. Work includes new wood doors,metal frames, walls, ceilings, finishes, and related mechanical, electrical, and plumbing. Alternate 1: Provide and install(1) rooftop exhaust fan in lieu of (2) separate exhaust fans. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Charleston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Commercial, Residential, Power Generation (CCGT), Metal, Education |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
