logo
ProjectPlanned

Basildon AI Data Centre Development

The status, timeline and source of this project. A free account opens every field.

Source: Bloomberg

A £1.3 billion AI data center is planned to be built near the town of Basildon in Essex, UK. This project is part of a broader AI infrastructure boom in southern Essex, which includes a hyperscale development by Google in Thurrock and a supercomputer project by Microsoft and Nvidia in Loughton. The area has adequate power, water, and brownfield sites suitable for such developments, and the project

Status
Prospective
Sector
Water Supply and Storage, Data Center, Power Generation (CCGT)
Location
Basildon, Essex, United Kingdom
Updated
19 Nov 2026
Source
Bloomberg

ConstructChat

Ask ConstructChat about Basildon AI Data Centre Development

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Basildon AI Data Centre Development” is an infrastructure initiative in the Water Supply and Storage sector, located in Basildon, Essex, United Kingdom. Taiyo aggregates data on it from Bloomberg.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

A £1.3 billion AI data center is planned to be built near the town of Basildon in Essex, UK. This project is part of a broader AI infrastructure boom in southern Essex, which includes a hyperscale development by Google in Thurrock and a supercomputer project by Microsoft and Nvidia in Loughton. The area has adequate power, water, and brownfield sites suitable for such developments, and the project is expected to bring construction and high-skilled jobs along with significant direct investment.

Original sector

Technology

Budget

Location

Country

United Kingdom (UK)

State

Essex

City

Basildon

Source

Source

Bloomberg

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Data Center, Power Generation (CCGT)

Article published date

2025-12-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project