logo

Basin Bridge Diesel-Fired Power Plant

Sector: Commercial • Location: India

Source: World Bank Group

Project
Active

The 200-MW (4x50-MW), $236m Basin Bridge Diesel-Fired Power Plant was originally developed by a joint venture between local firm GMR Vasavi Group (26%), CMS Energy Corporation (49%), and Energy Electricity Corporation (EEC, 25%). CMS Generation Co, a subsidiary of CMS Energy, acquired its interest in the plant in November 1997 and will provide operational and maintenance services for the plant up

Project Information FAQ

Project Information

5 Q
The project “Basin Bridge Diesel-Fired Power Plant” is an infrastructure initiative in the Commercial sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The 200-MW (4x50-MW), $236m Basin Bridge Diesel-Fired Power Plant was originally developed by a joint venture between local firm GMR Vasavi Group (26%), CMS Energy Corporation (49%), and Energy Electricity Corporation (EEC, 25%). CMS Generation Co, a subsidiary of CMS Energy, acquired its interest in the plant in November 1997 and will provide operational and maintenance services for the plant upon completion. EEC acquired its stake in January 1999 from GMR Vasavi Group. In fourth quarter 2001, CMS Energy announced its plans to sell all interests in its India power projects. In 2003, the GMR Energy Group picked up the equity stake of CMS Energy. Construction began in March 1997 and the plant was expected to be completed during 1999. The plant will serve as a base-load facility with its entire electric output sold to the Tamil Nadu State Electricity Board under a 15-year take-or-pay PPA that is renewable for two 5-year periods. Hyundai Heavy Industries Ltd. is the engineering, procurement, and construction (EPC) Contractor and Tata Consulting Engineers is the technical advisor. Financial closure was reached in October 1996 with Peregrine Capital as the financial advisor. The project has debt/equity ratio of roughly 70:30. The Industrial Bank of India (IBI) is providing $94.3 million and the Korean Export-Import Bank is providing suppliers credit worth $70.7 million. A 15-year fuel supply agreement was signed with the Hindustan Petroleum Corp Ltd. The necessary clearances for this project have been obtained.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data