Basin Bridge Diesel-Fired Power Plant
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The 200-MW (4x50-MW), $236m Basin Bridge Diesel-Fired Power Plant was originally developed by a joint venture between local firm GMR Vasavi Group (26%), CMS Energy Corporation (49%), and Energy Electricity Corporation (EEC, 25%). CMS Generation Co, a subsidiary of CMS Energy, acquired its interest in the plant in November 1997 and will provide operational and maintenance services for the plant up
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Oil and Gas, Bridge, Government, Manufacturing (Industrial)
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Basin Bridge Diesel-Fired Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 200-MW (4x50-MW), $236m Basin Bridge Diesel-Fired Power Plant was originally developed by a joint venture between local firm GMR Vasavi Group (26%), CMS Energy Corporation (49%), and Energy Electricity Corporation (EEC, 25%). CMS Generation Co, a subsidiary of CMS Energy, acquired its interest in the plant in November 1997 and will provide operational and maintenance services for the plant upon completion. EEC acquired its stake in January 1999 from GMR Vasavi Group. In fourth quarter 2001, CMS Energy announced its plans to sell all interests in its India power projects. In 2003, the GMR Energy Group picked up the equity stake of CMS Energy. Construction began in March 1997 and the plant was expected to be completed during 1999. The plant will serve as a base-load facility with its entire electric output sold to the Tamil Nadu State Electricity Board under a 15-year take-or-pay PPA that is renewable for two 5-year periods. Hyundai Heavy Industries Ltd. is the engineering, procurement, and construction (EPC) Contractor and Tata Consulting Engineers is the technical advisor. Financial closure was reached in October 1996 with Peregrine Capital as the financial advisor. The project has debt/equity ratio of roughly 70:30. The Industrial Bank of India (IBI) is providing $94.3 million and the Korean Export-Import Bank is providing suppliers credit worth $70.7 million. A 15-year fuel supply agreement was signed with the Hindustan Petroleum Corp Ltd. The necessary clearances for this project have been obtained. |
Original sector | Energy |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Oil and Gas, Bridge, Government, Manufacturing (Industrial) |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in India
- Kiru Hydroelectric Project Jammu and Kashmir India
- Pinnapuram Integrated Renewable Energy Project India
- Mahan I Power Project Madhya Pradesh
- UriII Hydroelectric Project Jammu and Kashmir
- Kakrapar Atomic Power Station Expansion
- Lower Subansiri Hydroelectric Power Project
- Agar Solar Park Madhya Pradesh
- Construction of the Aga Hall Estate, a high-rise residential project (2 towers of 45 and 56 stories) in Mumbai (India)
