logo
ProjectActive

Basin Bridge Diesel-Fired Power Plant

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The 200-MW (4x50-MW), $236m Basin Bridge Diesel-Fired Power Plant was originally developed by a joint venture between local firm GMR Vasavi Group (26%), CMS Energy Corporation (49%), and Energy Electricity Corporation (EEC, 25%). CMS Generation Co, a subsidiary of CMS Energy, acquired its interest in the plant in November 1997 and will provide operational and maintenance services for the plant up

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Oil and Gas, Bridge, Government, Manufacturing (Industrial)
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Basin Bridge Diesel-Fired Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Basin Bridge Diesel-Fired Power Plant” is an infrastructure initiative in the Commercial sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The 200-MW (4x50-MW), $236m Basin Bridge Diesel-Fired Power Plant was originally developed by a joint venture between local firm GMR Vasavi Group (26%), CMS Energy Corporation (49%), and Energy Electricity Corporation (EEC, 25%). CMS Generation Co, a subsidiary of CMS Energy, acquired its interest in the plant in November 1997 and will provide operational and maintenance services for the plant upon completion. EEC acquired its stake in January 1999 from GMR Vasavi Group. In fourth quarter 2001, CMS Energy announced its plans to sell all interests in its India power projects. In 2003, the GMR Energy Group picked up the equity stake of CMS Energy. Construction began in March 1997 and the plant was expected to be completed during 1999. The plant will serve as a base-load facility with its entire electric output sold to the Tamil Nadu State Electricity Board under a 15-year take-or-pay PPA that is renewable for two 5-year periods. Hyundai Heavy Industries Ltd. is the engineering, procurement, and construction (EPC) Contractor and Tata Consulting Engineers is the technical advisor. Financial closure was reached in October 1996 with Peregrine Capital as the financial advisor. The project has debt/equity ratio of roughly 70:30. The Industrial Bank of India (IBI) is providing $94.3 million and the Korean Export-Import Bank is providing suppliers credit worth $70.7 million. A 15-year fuel supply agreement was signed with the Hindustan Petroleum Corp Ltd. The necessary clearances for this project have been obtained.

Original sector

Energy

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Oil and Gas, Bridge, Government, Manufacturing (Industrial)

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project