logo
ProjectPlanning Schematics

BASIS Bellevue K-5 School

Planning schematics · Washington · Last reported Dec 2024

Source: Dodge USA

demolition of the existing church and the construction of a new school with 30,172 gross floor area for grades K through 5 with 300 students.

Status
Prospective
Sector
Education, Commercial
Location
Bellevue, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about BASIS Bellevue K-5 School

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “BASIS Bellevue K-5 School” is an infrastructure initiative in the Education sector, located in Bellevue, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

demolition of the existing church and the construction of a new school with 30,172 gross floor area for grades K through 5 with 300 students.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Bellevue

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Education, Commercial

Article published date

2024-12-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project