Basra–Haditha Oil Pipeline
Sector: Oil and Gas • Location: Iraq
Source: Rudaw
The Basra–Haditha oil pipeline is a 700-kilometer pipeline with a 56-inch diameter and a transport capacity of 2.5 million barrels per day. It aims to connect Basra's oil production to western Anbar (Haditha) and open three different outlets to Baniyas (Syria), Aqaba (Jordan), and Ceyhan (Turkey). The project was approved in late 2024 with a budget of 5.97 trillion dinars ($4.6 billion) and is bei
- Status
- Under Construction
- Sector
- Oil and Gas, Metal, Steel
- Location
- Iraq
- Updated
- 22 Jul 2026
- Source
- Rudaw
ConstructChat
Ask ConstructChat about Basra–Haditha Oil Pipeline
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Basra–Haditha oil pipeline is a 700-kilometer pipeline with a 56-inch diameter and a transport capacity of 2.5 million barrels per day. It aims to connect Basra's oil production to western Anbar (Haditha) and open three different outlets to Baniyas (Syria), Aqaba (Jordan), and Ceyhan (Turkey). The project was approved in late 2024 with a budget of 5.97 trillion dinars ($4.6 billion) and is being built by the Iraqi ministries of oil, trade, and minerals through the State Company for Iron and Steel under a Sino-Iraqi agreement. The project started in May 2026 with an allocation of $1.5 billion for its implementation. |
Original sector | Energy |
Budget |
Location
Country | Iraq |
Source
Source | Rudaw |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Metal, Steel |
Article published date | 2026-05-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
