Basswood Road Reconstruction
Sector: Car parking • Location: Windsor, Connecticut, United States of America
Source: Dodge USA
Full-depth roadway reconstruction from the intersection with Kennedy Rd extending west to the intersection of Macktown Rd. This project includes improvements to the drainage system, as well as the installation of new sidewalk and street lighting
- Status
- Prospective
- Sector
- Car parking, Water Supply and Storage, Road, Waste Processing and Treatment, Automotive, Government, Commercial
- Location
- Windsor, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Basswood Road Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Full-depth roadway reconstruction from the intersection with Kennedy Rd extending west to the intersection of Macktown Rd. This project includes improvements to the drainage system, as well as the installation of new sidewalk and street lighting |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Windsor |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Water Supply and Storage, Road, Waste Processing and Treatment, Automotive, Government, Commercial |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
