Bastrop River Stabilization Project
Sector: Government • Location: Bastrop, Texas, United States
Source: Community Impact
The city of Bastrop is planning an approximately $2.6 million project to stabilize the east bank of the Colorado River between Fisherman's Park and Hwy. 71. The project aims to reduce the long-term risk of future disasters such as floods by adding rock vanes to encourage sediment deposition and natural bank stabilization, along with riparian plantings to restore natural bank protection with roots
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Planned |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The city of Bastrop is planning an approximately $2.6 million project to stabilize the east bank of the Colorado River between Fisherman's Park and Hwy. 71. The project aims to reduce the long-term risk of future disasters such as floods by adding rock vanes to encourage sediment deposition and natural bank stabilization, along with riparian plantings to restore natural bank protection with roots and vegetation. The project would enhance approximately 1,200 feet of river bank and includes engineering, environmental, and administration services. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Government projects in United States
- EPC of Turbine and Foundation Structure in the Southwest Sea Wind Power Demonstration Complex
- LabCentral 238, Cambridge, Massachusetts, USA
- Bristol-Myers Squibb Manufacturing Plant, Devens, Massachusetts
- Cambridge Major Laboratories Active Pharmaceutical
- Djavad Mowafaghian Centre for Brain Health, Vancouver
- Louisiana Cancer Research Centre, New Orleans
- Novartis Vaccine Manufacturing Facility, North Carolina
- Chao Center for Industrial Pharmacy and Contract
