Batavia Coast Marina Boat Pens Expansion
Sector: Seaport • Location: Geraldton, Western Australia, Australia
Source: Marine Business News
The project involved the design and construction of a new floating jetty and 34 extra boat pens at the Batavia Coast Marina to increase vessel accommodation and meet growing demand. The upgrades increased the total number of pens from 84 to 118, with some pens capable of accommodating vessels up to 25 metres long. The project was funded by the WA Recovery Plan to support local jobs and businesses
- Status
- Closed
- Sector
- Seaport
- Location
- Geraldton, Western Australia, Australia
- Updated
- 22 Jul 2026
- Source
- Marine Business News
ConstructChat
Ask ConstructChat about Batavia Coast Marina Boat Pens Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involved the design and construction of a new floating jetty and 34 extra boat pens at the Batavia Coast Marina to increase vessel accommodation and meet growing demand. The upgrades increased the total number of pens from 84 to 118, with some pens capable of accommodating vessels up to 25 metres long. The project was funded by the WA Recovery Plan to support local jobs and businesses post-COVID-19 pandemic. |
Original sector | Marine Infrastructure |
Budget |
Location
Country | Australia |
State | Western Australia |
City | Geraldton |
Source
Source | Marine Business News |
URL |
More Details
Record type | Project |
Sector | Seaport |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
