Bateman Gold Project
Construction · Ontario · Last reported May 2021
Source: Dodge USA
Consists of the high-grade F2 Gold Deposit, more than 14,000 m of underground development including a commissioned shaft that goes down approximately 730 m below surface, and surface infrastructure that includes a 1,250 tonne per day mill facility (currently in care and maintenance), a completed tailings management facility, electric power supply and substation, 200-person camp, earth-works and ci
- Status
- Under Construction
- Sector
- Commercial, Power Generation (CCGT), Power Transmission, Manufacturing (Industrial)
- Location
- Red Lake, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bateman Gold Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Consists of the high-grade F2 Gold Deposit, more than 14,000 m of underground development including a commissioned shaft that goes down approximately 730 m below surface, and surface infrastructure that includes a 1,250 tonne per day mill facility (currently in care and maintenance), a completed tailings management facility, electric power supply and substation, 200-person camp, earth-works and civil-works. |
Budget |
Location
Country | Canada |
State | Ontario |
City | Red Lake |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Power Transmission, Manufacturing (Industrial) |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
