logo

BATI RAMAN PILOT PROJECT

Sector: Water Supply and Storage • Location: Turkey

Source: World Bank Group

Project
Closed

The Bati Ramon Oil Development Project includes: (i) the Bati Raman enhanced oil recovery field test - a field demonstration test of the carbon dioxide injection enhanced oil recovery (EOR) technology, on a limited area of the Bati Raman reservoir for evaluating its suitability and determining the data required for designing a full field project. It consists of drilling five additional wells at th

Project Information FAQ

Project Information

5 Q
The project “BATI RAMAN PILOT PROJECT” is an infrastructure initiative in the Water Supply and Storage sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Bati Ramon Oil Development Project includes: (i) the Bati Raman enhanced oil recovery field test - a field demonstration test of the carbon dioxide injection enhanced oil recovery (EOR) technology, on a limited area of the Bati Raman reservoir for evaluating its suitability and determining the data required for designing a full field project. It consists of drilling five additional wells at the Dodan gas field, laying of a pipeline, drilling of five additional wells and the preparation of 30 wells to handle CO2 injection and oil production, and the testing and evaluation of the results; (ii) the Raman oil field development - a production component covering the drilling and completion of 18 new production wells, along with provision of associated surface and sub-surface equipment in a newly discovered extension of the Raman oil field, and a reservoir analysis study to determine the optimum approach to an enhanced oil recovery program for the field; (iii) the Thrace (Hamitabat) gas field - an evaluation of the production potential of the Thrace gas field to provide reliable estimates of gas reserves and productivity through the stimulation of the gas field by fracturing six to ten wells, and a study to determine the optimum use of the gas.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data