BATI RAMAN PILOT PROJECT
Closed · Turkey
Source: World Bank Group
The Bati Ramon Oil Development Project includes: (i) the Bati Raman enhanced oil recovery field test - a field demonstration test of the carbon dioxide injection enhanced oil recovery (EOR) technology, on a limited area of the Bati Raman reservoir for evaluating its suitability and determining the data required for designing a full field project. It consists of drilling five additional wells at th
- Status
- Closed
- Sector
- Water Supply and Storage, Oil and Gas, Government
- Location
- Turkey
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about BATI RAMAN PILOT PROJECT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Bati Ramon Oil Development Project includes: (i) the Bati Raman enhanced oil recovery field test - a field demonstration test of the carbon dioxide injection enhanced oil recovery (EOR) technology, on a limited area of the Bati Raman reservoir for evaluating its suitability and determining the data required for designing a full field project. It consists of drilling five additional wells at the Dodan gas field, laying of a pipeline, drilling of five additional wells and the preparation of 30 wells to handle CO2 injection and oil production, and the testing and evaluation of the results; (ii) the Raman oil field development - a production component covering the drilling and completion of 18 new production wells, along with provision of associated surface and sub-surface equipment in a newly discovered extension of the Raman oil field, and a reservoir analysis study to determine the optimum approach to an enhanced oil recovery program for the field; (iii) the Thrace (Hamitabat) gas field - an evaluation of the production potential of the Thrace gas field to provide reliable estimates of gas reserves and productivity through the stimulation of the gas field by fracturing six to ten wells, and a study to determine the optimum use of the gas. |
Original sector | (Historic)Oil & Gas |
Location
Country | Turkey |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Oil and Gas, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
