Batoka Gorge hydropower PPP project
The status, timeline and source of this project. A free account opens every field.
Source: InfraPPPWorld
The project will be located about 34 mi downstream from Victoria Falls and consist of a roller-compacted-concrete gravity arch dam 181 m high that impounds a reservoir with a catchment area of 508,000 km2. The site will feature two underground powerhouses, one on each river bank, each with a capacity of 800 MW, totalling 2400 MW.
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Hydro
- Location
- Zimbabwe
- Updated
- 19 Nov 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Batoka Gorge hydropower PPP project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | project in planning |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project will be located about 34 mi downstream from Victoria Falls and consist of a roller-compacted-concrete gravity arch dam 181 m high that impounds a reservoir with a catchment area of 508,000 km2. The site will feature two underground powerhouses, one on each river bank, each with a capacity of 800 MW, totalling 2400 MW. |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Zimbabwe |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Hydro |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
