Batterson & Jerseydale New Construction REBID
Sector: Metal • Location: Oakhurst, California, United States of America
Source: Dodge USA
Jerseydale Work & Batterson Work Center Barracks This project is to design and construct: One 6-Person Barracks with office layout and connect to existing utilities in the area. Construct a new prefab metal building 100ft x 100ft, 20ft height with pull though access (2 rolling doors on each side 14ft wide & 16ft tall) with two restrooms on concrete foundation, (fully insulated, connect to existing
- Status
- Under Construction
- Sector
- Metal, Water Supply and Storage, Cement, Residential, Power Transmission, Power Generation (CCGT), Commercial, Road, Manufacturing (Industrial)
- Location
- Oakhurst, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Batterson & Jerseydale New Construction REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Jerseydale Work & Batterson Work Center Barracks This project is to design and construct: One 6-Person Barracks with office layout and connect to existing utilities in the area. Construct a new prefab metal building 100ft x 100ft, 20ft height with pull though access (2 rolling doors on each side 14ft wide & 16ft tall) with two restrooms on concrete foundation, (fully insulated, connect to existing utilities water/electrical, and design a new a septic system). Construct a new prefab metal buil... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Oakhurst |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Cement, Residential, Power Transmission, Power Generation (CCGT), Commercial, Road, Manufacturing (Industrial) |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
