logo

Battery Electric Bus Facility Upgrades

Sector: Cement • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
In Progress

This project is for the design, purchase, and installation of approximately 80 in-depot charging points and related infrastructure at three locations: Victoria (62); Whistler (16); and Nelson (2). In support of the low carbon fleet replacement strategy and reducing operational carbon emissions, this infrastructure project is required to support the deployment of Heavy Duty (HD) Battery Electric B

Status
Under Construction
Sector
Cement, Energy Storage, Power Transmission, Automotive, Car parking, Power Generation (CCGT), Government
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Battery Electric Bus Facility Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Battery Electric Bus Facility Upgrades” is an infrastructure initiative in the Cement sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project is for the design, purchase, and installation of approximately 80 in-depot charging points and related infrastructure at three locations: Victoria (62); Whistler (16); and Nelson (2). In support of the low carbon fleet replacement strategy and reducing operational carbon emissions, this infrastructure project is required to support the deployment of Heavy Duty (HD) Battery Electric Buses (BEBs), reducing the reliance on diesel fueled vehicles and supporting CleanBC targets for reducing GHG emissions. For larger installations servicing Victoria and Whistler transit systems, all electrical equipment will be in self-contained central charging units that can support up to 20 vehicles simultaneously, mounted on concrete pads in existing depot locations, and not permanently installed. Charging dispensers will be installed at parking spaces serviced by underground conduits or overhead gantry structures. New utility connections are expected to be required to support the new charging infrastructure. For distributed small installations of up to two charging points (Nelson), charging equipment will be installed using available on site power with minimal site disturbance. Chargers will be self-contained charging units with corded dispensers or small modular charging units with 2-4 dispenser cords. The project scope will support the acquisition of approximately 66 heavy duty BEBs.

Original sector

Public Transit

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Cement, Energy Storage, Power Transmission, Automotive, Car parking, Power Generation (CCGT), Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project