Battery Energy Storage at Tunnel Hydro
Sector: Tunnel • Location: Connecticut, United States
Source: Renewable Energy World
FirstLight Power plans to retire its Tunnel Jet fossil fuel generation facility and replace it with a 17 MW battery energy storage system at its 2.1 MW Tunnel Hydro facility. This project aims to pair batteries with hydropower to supply renewable energy to Connecticut communities when it is most needed.
- Status
- Prospective
- Sector
- Tunnel, Natural Gas, Power Generation (CCGT), Energy Storage, Hydro
- Location
- Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Renewable Energy World
ConstructChat
Ask ConstructChat about Battery Energy Storage at Tunnel Hydro
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | FirstLight Power plans to retire its Tunnel Jet fossil fuel generation facility and replace it with a 17 MW battery energy storage system at its 2.1 MW Tunnel Hydro facility. This project aims to pair batteries with hydropower to supply renewable energy to Connecticut communities when it is most needed. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Connecticut |
Source
Source | Renewable Energy World |
URL |
More Details
Record type | Project |
Sector | Tunnel, Natural Gas, Power Generation (CCGT), Energy Storage, Hydro |
Article published date | 2025-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
