Battery Energy Storage System at Deerfield No. 3 Station
Sector: Hydro • Location: Shelburne Falls, Massachusetts, United States
Source: Greenfield Recorder
Great River Hydro is planning to develop its first battery energy storage system at the Deerfield No. 3 Station in Shelburne Falls. The project involves installing six batteries on a concrete pad to store energy during low-cost periods and discharge it during peak demand hours, contributing to grid stability and energy cost reduction.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Planned |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Great River Hydro is planning to develop its first battery energy storage system at the Deerfield No. 3 Station in Shelburne Falls. The project involves installing six batteries on a concrete pad to store energy during low-cost periods and discharge it during peak demand hours, contributing to grid stability and energy cost reduction. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
