Battery Energy Storage System Project in Assam
Sector: Energy Storage • Location: Assam, India
Source: Energetica India Magazine
A 25 MW/100 MWh Battery Energy Storage System (BESS) project estimated at INR 170 crore is planned to enhance renewable energy integration and grid stability.
- Status
- Prospective
- Sector
- Energy Storage, Government
- Location
- Assam, India
- Updated
- 22 Jul 2026
- Source
- Energetica India Magazine
ConstructChat
Ask ConstructChat about Battery Energy Storage System Project in Assam
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 25 MW/100 MWh Battery Energy Storage System (BESS) project estimated at INR 170 crore is planned to enhance renewable energy integration and grid stability. |
Original sector | Energy |
Budget |
Location
Country | India |
State | Assam |
Source
Source | Energetica India Magazine |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Government |
Article published date | 2026-07-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
