logo

Battery of the Nation ' A Concept Study of Tasmanian Pumped Hydro Options

Sector: Energy Storage • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

Project
Closed

The Battery of the Nation initiative is investigating and developing a pathway of future development opportunities for Tasmania to make a greater contribution to the National Energy Market.With the support of ARENA funding, this concept study has developed a list of potential pumped hydro sites in Tasmania that represent over 4800 MW of pumped hydro storage capacity in Tasmania. These options will

Project Information FAQ

Project Information

5 Q
The project “Battery of the Nation ' A Concept Study of Tasmanian Pumped Hydro Options” is an infrastructure initiative in the Energy Storage sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Battery of the Nation initiative is investigating and developing a pathway of future development opportunities for Tasmania to make a greater contribution to the National Energy Market.With the support of ARENA funding, this concept study has developed a list of potential pumped hydro sites in Tasmania that represent over 4800 MW of pumped hydro storage capacity in Tasmania. These options will be the subject of pre-feasibility studies which will reduce the list to 2500 MW of pumped hydro potential.How the project worksThis concept study has reduced a list of over 2,000 potential pumped hydro options in Tasmania to 14. These options have been selected through high level technical assessment of project sites and rapid workshop assessments with a wide range of internal stakeholders from technical and scientific disciplines across the Hydro Tasmania group.The selected options are those deemed most likely to meet key project and sustainable development objectives based on early stage analysis and will be further assessed as part of the next phase of study which is pre-feasibility. If further investigations show the selected sites do not meet these objectives, other alternative sites may be considered. The number of selected options will be reduced further during pre-feasibility studies to meet a target of 2500 MW combined installed capacity.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data