Battery of the Nation ' A Concept Study of Tasmanian Pumped Hydro Options
Sector: Energy Storage • Location: Australia
Source: Australian Renewable Energy Agency (ARENA)
The Battery of the Nation initiative is investigating and developing a pathway of future development opportunities for Tasmania to make a greater contribution to the National Energy Market.With the support of ARENA funding, this concept study has developed a list of potential pumped hydro sites in Tasmania that represent over 4800 MW of pumped hydro storage capacity in Tasmania. These options will
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Battery of the Nation initiative is investigating and developing a pathway of future development opportunities for Tasmania to make a greater contribution to the National Energy Market.With the support of ARENA funding, this concept study has developed a list of potential pumped hydro sites in Tasmania that represent over 4800 MW of pumped hydro storage capacity in Tasmania. These options will be the subject of pre-feasibility studies which will reduce the list to 2500 MW of pumped hydro potential.How the project worksThis concept study has reduced a list of over 2,000 potential pumped hydro options in Tasmania to 14. These options have been selected through high level technical assessment of project sites and rapid workshop assessments with a wide range of internal stakeholders from technical and scientific disciplines across the Hydro Tasmania group.The selected options are those deemed most likely to meet key project and sustainable development objectives based on early stage analysis and will be further assessed as part of the next phase of study which is pre-feasibility. If further investigations show the selected sites do not meet these objectives, other alternative sites may be considered. The number of selected options will be reduced further during pre-feasibility studies to meet a target of 2500 MW combined installed capacity. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
