logo

Battery of the Nation

Sector: Commercial • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

Project
Closed

The Battery of the Nation initiative is investigating and developing a pathway of future development opportunities for Tasmania to make a greater contribution to the National Energy Market (NEM). With the support of ARENA funding, Hydro Tasmania have conducted two pre-feasibility studies on the Tarraleah and Gordon hydro-electric power schemes exploring how each may be redeveloped for the future N

Project Information FAQ

Project Information

5 Q
The project “Battery of the Nation” is an infrastructure initiative in the Commercial sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Battery of the Nation initiative is investigating and developing a pathway of future development opportunities for Tasmania to make a greater contribution to the National Energy Market (NEM). With the support of ARENA funding, Hydro Tasmania have conducted two pre-feasibility studies on the Tarraleah and Gordon hydro-electric power schemes exploring how each may be redeveloped for the future NEM.The Tarraleah scheme located in the Upper Derwent River in Tasmania commenced generation in 1938 and continued to be developed in a number of stages to 1966. The Tarraleah Scheme currently generates around 634 GWh per year of largely base load energy, providing around 6.5% of Hydro Tasmania’s annual power generation. The analysis found that an option to expand the capacity of the Tarraleah scheme to 220MW and increase its flexibility in operation was potentially feasible.As part of this project Hydro Tasmania also conducted a pre-feasibility analysis into how the Gordon hydro-electric power scheme may be redeveloped for the future NEM. The report found that a solution to more efficiently generate power from the environmental water flow released to the Gordon River using a smaller turbine designed for these flows is technically and commercially feasible. However, the project was prioritised against other business capital expenditure needs and will not be proceeding to implementation at this stage.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data