Battery Project in San Diego County
Sector: Energy Storage • Location: California, United States
Source: Los Angeles Times
A 320-megawatt battery storage project by AES Corp. in San Diego County, California, cancelled due to fierce resistance from residents and proximity to neighborhoods and high-risk wildfire zones.
- Status
- Closed
- Sector
- Energy Storage
- Location
- California, United States of America
- Updated
- 22 Jul 2026
- Source
- Los Angeles Times
ConstructChat
Ask ConstructChat about Battery Project in San Diego County
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | cancelled |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 320-megawatt battery storage project by AES Corp. in San Diego County, California, cancelled due to fierce resistance from residents and proximity to neighborhoods and high-risk wildfire zones. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | California |
Source
Source | Los Angeles Times |
URL |
More Details
Record type | Project |
Sector | Energy Storage |
Article published date | 2026-04-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in United States
- Tampa Bay Seawater Desalination Plant
- Centrally Managed Pay-and-Display Parking
- Chevron Richmond Refinery
- Nestle Food and Distribution Centre, USA
- Pepperidge Farm Bakery Plant
- Baldock Solar Highway
- Doyle Drive Replacement / Presidio Parkway, San Francisco, US
- Newtown Creek (35-G) North and North Central Batteries
