logo

Battery Project in San Diego County

Sector: Energy Storage • Location: California, United States

Source: Los Angeles Times

Project
Cancelled

A 320-megawatt battery storage project by AES Corp. in San Diego County, California, cancelled due to fierce resistance from residents and proximity to neighborhoods and high-risk wildfire zones.

Status
Closed
Sector
Energy Storage
Location
California, United States of America
Updated
22 Jul 2026
Source
Los Angeles Times

ConstructChat

Ask ConstructChat about Battery Project in San Diego County

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Battery Project in San Diego County” is an infrastructure initiative in the Energy Storage sector, located in California, United States. Taiyo aggregates data on it from Los Angeles Times.

Participants

Not available for this record.

Status

Original status

cancelled

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 320-megawatt battery storage project by AES Corp. in San Diego County, California, cancelled due to fierce resistance from residents and proximity to neighborhoods and high-risk wildfire zones.

Original sector

Energy

Location

Country

United States of America (USA)

State

California

Source

Source

Los Angeles Times

URL

More Details

Record type

Project

Sector

Energy Storage

Article published date

2026-04-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project