Battery Storage Facility at 426 E. Brighton Ave.
Sector: Energy Storage • Location: Syracuse, New York, United States
Source: Syracuse
New Leaf Energy of Troy is proposing to build a large-scale battery energy storage system at 426 E. Brighton Ave. in Syracuse. The system charges at night using grid power and feeds electricity back during peak demand, storing enough power for 6,000 to 7,000 households. The project has raised fire safety concerns among residents and city officials.
- Status
- Prospective
- Sector
- Energy Storage, Power Generation (CCGT)
- Location
- Syracuse, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Syracuse
ConstructChat
Ask ConstructChat about Battery Storage Facility at 426 E. Brighton Ave.
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | New Leaf Energy of Troy is proposing to build a large-scale battery energy storage system at 426 E. Brighton Ave. in Syracuse. The system charges at night using grid power and feeds electricity back during peak demand, storing enough power for 6,000 to 7,000 households. The project has raised fire safety concerns among residents and city officials. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | New York |
City | Syracuse |
Source
Source | Syracuse |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT) |
Article published date | 2025-12-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
