logo

Battery Street Sanitary Sewer - Replacement of vitrified clay pipe

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

OBJECTIVE: The Town is actively adopting wastewater infrastructure renewal projects that improve operation and maintenance requirements, reduce inflow and infiltration, provide enhancements to the natural environment and support long term sustainable infrastructure. SCOPE: The scope of this project includes the replacement of 220 metres of 450mm diameter vitrified clay sanitary sewers from Bertie

Status
Closed
Sector
Water Supply and Storage, Metal, Energy Storage, Road, Waste Processing and Treatment
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Battery Street Sanitary Sewer - Replacement of vitrified clay pipe

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Battery Street Sanitary Sewer - Replacement of vitrified clay pipe” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

OBJECTIVE: The Town is actively adopting wastewater infrastructure renewal projects that improve operation and maintenance requirements, reduce inflow and infiltration, provide enhancements to the natural environment and support long term sustainable infrastructure. SCOPE: The scope of this project includes the replacement of 220 metres of 450mm diameter vitrified clay sanitary sewers from Bertie Street to Catherine Street that were constructed in 1925. The sanitary sewer is in a poor structural state and is beyond the end of its service life. Replacement of the sanitary sewer is the recommended rehabilitation alternative along with the replacement of maintenance holes and sanitary laterals. Additionally, the project includes the replacement of 110 metres of 150mm diameter cast iron watermain constructed in 1920 from Catharine Street to Murray Street. The watermain is beyond the end of its service life and is prone to failure which leads to water quality concerns. Considering the age of the watermain, replacement of the watermain is the recommended rehabilitation alternative. This is a priority project for the Town. Town Council has accelerated this project to design in 2016 and construction in 2017 through administrative report IS-22-2016. The design for this project is currently being completed by an engineering design firm with a planned 2017 construction start. OUTPUT: The estimated reduction in stormwater (inflow & infiltration) entering the wastewater distribution system is approximately 2,300 cubic meters per annum as a direct result of this project. The replacement of the watermain will improve system reliability; reduce operational issues as well as reducing opportunities for negative impacts to water quality. This project will directly contribute to reduce point source sanitary overflows to meet both regulatory requirements and objectives of the remedial action plan for the Niagara River.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Metal, Energy Storage, Road, Waste Processing and Treatment

Article published date

2026-03-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project