logo

Battery Street Water - Replacement of Cast-Iron Watermain

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

Ojective: The town is actively adopting wastewater infrastructure renewal projects that improve operation and maintenance requirements, reduce inflow and infiltration, provide enhancements to the natural environment and support long term sustainable infrastructure. Scope: The scope of this project includes the replacement of 220 metres of 450mm diameter vitrified clay sanitary sewers from Bertie S

Project Information FAQ

Project Information

4 Q
The project “Battery Street Water - Replacement of Cast-Iron Watermain” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Ojective: The town is actively adopting wastewater infrastructure renewal projects that improve operation and maintenance requirements, reduce inflow and infiltration, provide enhancements to the natural environment and support long term sustainable infrastructure. Scope: The scope of this project includes the replacement of 220 metres of 450mm diameter vitrified clay sanitary sewers from Bertie Street to Catherine Street that were constructed in 1925. The sanitary sewer is in a poor structural state and is beyond the end of its service life. Replacement of the sanitary sewer is the recommended rehabilitation alternative along with the replacement of maintenance holes and sanitary laterals. Additionally, the project includes the replacement of 110 metres of 150mm diameter cast iron watermain constructed in 1920 from Catharine Street to Murray Street. The watermain is beyond the end of its service life and is prone to failure which leads to water quality concerns. Considering the age of the watermain, replacement of the watermain is the recommended rehabilitation alternative. This is a priority project for the town. Town council has accelerated this project to design in 2016 and construction in 2017 through administrative report IS-22-2016. The design for this project is currently being completed by an engineering design firm with a planned 2017 construction start. Output: The estimated reduction in stormwater (inflow and infiltration) entering the wastewater distribution system is approximately 2,300 cubic meters per annum as a direct result of this project. The replacement of the watermain will improve system reliability; reduce operational issues as well as reducing opportunities for negative impacts to water quality. This project will directly contribute to reduce point source sanitary overflows to meet both regulatory requirements and objectives of the remedial action plan for the Niagara River.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data