Battery Waterfront Elevation Project
Planned · New York · Last reported Dec 2022
Source: The Broadsheet
The Battery Waterfront Elevation Project aims to raise the waterfront walkway five feet to protect the historic park from future sea-level rise and extreme weather events. The project is currently 50% complete in its design phase, with construction expected to begin in late 2022. It will also improve drainage and link with other coastal resiliency projects in Lower Manhattan.
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Energy Storage, Government
- Location
- New York, United States of America
- Updated
- 19 Nov 2026
- Source
- The Broadsheet
ConstructChat
Ask ConstructChat about Battery Waterfront Elevation Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Battery Waterfront Elevation Project aims to raise the waterfront walkway five feet to protect the historic park from future sea-level rise and extreme weather events. The project is currently 50% complete in its design phase, with construction expected to begin in late 2022. It will also improve drainage and link with other coastal resiliency projects in Lower Manhattan. |
Original sector | Coastal Resiliency |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | The Broadsheet |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Energy Storage, Government |
Article published date | 2025-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
