Bauna FPSO Revamp
Sector: Oil and Gas • Location: Brazil
Source: Upstream Online
Karoon Energy is preparing to launch a major revitalisation programme on its Bauna floating production, storage and offloading vessel offshore Brazil. The project involves spending between US$55 million and US$65 million in 2026 on upgrades to the Cidade de Itajai FPSO, followed by a further US$80 million to US$90 million between 2030 and 2034 to keep the vessel operating safely until the Bauna pr
- Status
- Prospective
- Sector
- Oil and Gas
- Location
- Brazil
- Updated
- 19 Nov 2026
- Source
- Upstream Online
ConstructChat
Ask ConstructChat about Bauna FPSO Revamp
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Karoon Energy is preparing to launch a major revitalisation programme on its Bauna floating production, storage and offloading vessel offshore Brazil. The project involves spending between US$55 million and US$65 million in 2026 on upgrades to the Cidade de Itajai FPSO, followed by a further US$80 million to US$90 million between 2030 and 2034 to keep the vessel operating safely until the Bauna production concession expires in 2039. The revamp aims to cut costs, extend field life by approximately seven years, and capitalize on a 35% increase in reserves. |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Brazil |
Source
Source | Upstream Online |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
