BAUSKA BYPASS PPP PROJECT
The status, timeline and source of this project. A free account opens every field.
Source: European Investment Bank (EIB)
Greenfield construction and maintenance of the 14.25 km long road section of the A7 motorway Riga - Bauska - Lithuanian border along Bauska municipality, part of Via Baltica international road corridor and two connector roads with combined length of 5.0 km. The project will be implemented under the Design-Build-Finance-Maintain (DBFM) PPP model, with a design and construction period of 3 years, fo
- Status
- Prospective
- Sector
- Road
- Location
- Latvia
- Updated
- 19 Nov 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about BAUSKA BYPASS PPP PROJECT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Greenfield construction and maintenance of the 14.25 km long road section of the A7 motorway Riga - Bauska - Lithuanian border along Bauska municipality, part of Via Baltica international road corridor and two connector roads with combined length of 5.0 km. The project will be implemented under the Design-Build-Finance-Maintain (DBFM) PPP model, with a design and construction period of 3 years, followed by 20 years of maintenance. |
Original sector | Transport |
Budget |
Location
Country | Latvia |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-11-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
