Bavarian-Austrian advanced Welding wire Research and Innovation Action
The status, timeline and source of this project. A free account opens every field.
Source: Keep.EU
With today's manufacturing technology for welding filler wires, one pushes the limits of multi-stage wire drawing, if you want to process higher strength or less ductile grades beyond the standard alloys. The LKR has developed a novel process chain for the difficult-to-process AlMgScZr alloys, which uses the direct extrusion of bolts as a massive forming step, which is to be transferred to commerc
- Status
- Closed
- Sector
- Commercial, Manufacturing (Industrial), Government, Electric Vehicles (EVs), Automotive, Power Generation (CCGT)
- Location
- Austria
- Updated
- 22 Jul 2026
- Source
- Keep.EU
ConstructChat
Ask ConstructChat about Bavarian-Austrian advanced Welding wire Research and Innovation Action
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | With today's manufacturing technology for welding filler wires, one pushes the limits of multi-stage wire drawing, if you want to process higher strength or less ductile grades beyond the standard alloys. The LKR has developed a novel process chain for the difficult-to-process AlMgScZr alloys, which uses the direct extrusion of bolts as a massive forming step, which is to be transferred to commercial alloys. In the laboratory only wire lengths of max. 10m are far too short for commercialization. This new technology has to be further developed. The vision of BAWeRIA is to operate all core processes integrated in a new production facility in Bavaria or Austria from the melt to the drawn wire, setting new global standards for alloys, costs and delivery times for standard and new welding wire alloys. |
Budget |
Location
Country | Austria |
Source
Source reliability | Medium |
Source | Keep.EU |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Government, Electric Vehicles (EVs), Automotive, Power Generation (CCGT) |
Article published date | 2023-07-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Austria
- Drive-Through COVID-19 Community Testing
- Mellach CombinedCycle Gas Turbine CCGT Plant Austria
- Obervermuntwerk II Pumped Storage Power Plant Vorarlberg
- Break Stuff App
- Boehringer Ingelheim’s Biopharmaceutical Production Facility, Vienna, Austria
- HYPO VORARLBERG MEZZANINE ABS FOR EE & NZEB
- BITMOVIN (EGFF)
- AUSTRIAN ENERGY EFFICIENCY FL
