BAWAG GROWTH FOR ENERGY
The status, timeline and source of this project. A free account opens every field.
Source: European Investment Bank (EIB)
Line-by-line guarantee agreement with BAWAG PSK for up to 50% of their risk exposure, under the G4E guarantee concept. Sub-loans will finance mostly energy infrastructure (incl. district heating/cooling and electricity networks) as well as public water and public transport. Other allocations from adjacent areas may be permitted on a case-by-case basis.
- Status
- Prospective
- Sector
- Mass Transit, Power Generation (CCGT), Water Supply and Storage
- Location
- Austria
- Updated
- 19 Nov 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about BAWAG GROWTH FOR ENERGY
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under appraisal |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Line-by-line guarantee agreement with BAWAG PSK for up to 50% of their risk exposure, under the G4E guarantee concept. Sub-loans will finance mostly energy infrastructure (incl. district heating/cooling and electricity networks) as well as public water and public transport. Other allocations from adjacent areas may be permitted on a case-by-case basis. |
Original sector | Energy, Water, sewerage, Transport |
Location
Country | Austria |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Power Generation (CCGT), Water Supply and Storage |
Article published date | 2026-10-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
