Bay Side Home - Facility Upgrades
Sector: Residential • Location: Nova Scotia, Canada
Source: Infrastructure Canada
The facility upgrades consist of two components: 1) the replacement of ERV’s & HVAC (heating, ventilation - air filtration, air-conditioning) systems; and 2) the replacement of 4 outside doors including maglocks & wandering system. Rationale: 1) equipment has come to the end of its useful life ; and 2) safety and accessibility.
- Status
- Closed
- Sector
- Residential, Government
- Location
- Nova Scotia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Bay Side Home - Facility Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The facility upgrades consist of two components: 1) the replacement of ERV’s & HVAC (heating, ventilation - air filtration, air-conditioning) systems; and 2) the replacement of 4 outside doors including maglocks & wandering system. Rationale: 1) equipment has come to the end of its useful life ; and 2) safety and accessibility. |
Original sector | Ventilation Systems |
Location
Country | Canada |
State | Nova Scotia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Residential, Government |
Article published date | 2025-07-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
