Bay Terminal Marine Infrastructure Development Project

Sector: Mass Transit • Location: Bangladesh

Source: World Bank Group

Project
Active

The Bay Terminal is designed to accommodate larger vessels and improve cargo handling efficiency in Bangladesh maritime ports. It is a significant step towards modernizing the country's maritime port infrastructure and improving its connectivity to international markets. The Bay Terminal is expected to be developed in two phases. Phase one (2024-2031) involves IDA financing for the construction of

Project Information FAQ

Project Information

5 Q
The project “Bay Terminal Marine Infrastructure Development Project” is an infrastructure initiative in the Mass Transit sector, located in Bangladesh. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Bay Terminal is designed to accommodate larger vessels and improve cargo handling efficiency in Bangladesh maritime ports. It is a significant step towards modernizing the country's maritime port infrastructure and improving its connectivity to international markets. The Bay Terminal is expected to be developed in two phases. Phase one (2024-2031) involves IDA financing for the construction of the breakwater, capital dredging of the entrance channel and port basin, and installation of navigation aids. Associated facilities in Phase one is the Multi-Purpose Terminal (MPT), Container Terminal 1 (CT 1), and the hinterland connections, which includes land reclamation as part of the land development. Potential International Terminal Operators (ITOs) have been identified for the development and financing of the MPT and CT 1 in Phase one. The Government of Bangladesh will reclaim the lands and develop the connecting transportation infrastructure (an approximately 700-meter railway connector and two 500-meter road connectors) to link Bay Terminal to the existing transport network. In Phase two (expected after IDA Project closure), Container Terminal 2 (CT 2) will be constructed when the throughput of CT 1 has reached a pre-agreed threshold that ensures its financial viability. More specifically, the Bay Terminal Marine Infrastructure Development Project (the Project), supported by IDA, will finance three components: (i) Component 1: Support Port Marine Civil Infrastructure, Equipment, and Navigation System Development; (ii) Component 2: Support Port Efficiency Improvements and Capacity Development; and (iii) Component 3: Contingency Emergency Response (CERC) (will provide support for an immediate response to an eligible crisis or emergency, as needed). The Government of Bangladesh (GoB) will finance land costs, relocation, landfilling, and road/rail connectivity. CPA will be the implementing agency for the Project and oversee all public sector financed activities of the Bay Terminal. CPA will also sign long-term concession agreements with the International Terminal Operator for the financing, development, and operation of CT 1. CPA will be responsible for Phase one (Project and Associated Facilities) environmental and social (E&S) risk management. As an integral component of the preparation of the Project, the Environmental Impact Assessment (EIA) prepared as part of the previous Feasibility Study in 2017 has been updated as Environmental and Social Impact Assessment (ESIA) by CPA . This ESIA and related ESMPs, together with an agreed timebound Environmental and Social Commitment Plan (ESCP) will ensure compliance with the ESF and guide the completion of the remaining E&S instruments in Phase one. The Bank will ensure that CPA’s concession agreements with ITOs in Phase one include appropriate clauses to guarantee design, construction, operation, monitoring, and reporting compliance with the World Bank’s Environmental and Social Framework (ESF) requirements.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data