logo

Bayburt Cemisgezek Girlevik HPPs - Group 14

Sector: Water Supply and Storage • Location: Turkey

Source: World Bank Group

Project
Active

On January 3thd 2011, the Turkish Privatization Administration (Ozellestirme Idaresi Baskanligi or OIB) signed with the Turkish industrial group Boydak a 49 years concession granting the operating rights of three mini hydro power plants, known as Group 14, with a total capacity of 3.552 MW. The total capacity of minihydro power plants was 0.396 MW Bayburt, 3.040 MW Girevlik and 0.116 MW Cemisgezek

Status
Prospective
Sector
Water Supply and Storage, Hydro, Power Generation (CCGT), Government, Manufacturing (Industrial)
Location
Turkey
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Bayburt Cemisgezek Girlevik HPPs - Group 14

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Bayburt Cemisgezek Girlevik HPPs - Group 14” is an infrastructure initiative in the Water Supply and Storage sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

On January 3thd 2011, the Turkish Privatization Administration (Ozellestirme Idaresi Baskanligi or OIB) signed with the Turkish industrial group Boydak a 49 years concession granting the operating rights of three mini hydro power plants, known as Group 14, with a total capacity of 3.552 MW. The total capacity of minihydro power plants was 0.396 MW Bayburt, 3.040 MW Girevlik and 0.116 MW Cemisgezek, located in Bayburt, Tunceli, and Erzincan, Turkey. The plants were transferred under the Transfer of Operating Rights (TOR) scheme for 49 years with no investment obligations to expand or rehabilitate the power plant. Based on this information, the project was classified as a lease contract in the PPI Database. The project was expected to sell electricity produced in the liberalized electricity market in Turkey. In May 2011, Boydak Energy Production Co. won the operating rights of Group 14 mini hydro plant in an open tender held by OIB by offering $56.08 million in the public auction. The tender of this power plant received 54 bids in total. The tender, which were conducted by competitive bidding , followed the sale of other groups over the past two weeks from the same tender that ended in February. Group 14 was one of the 19 groups comprising of small and medium hydro power plants which OIB tendered to private consortia in February 2010. The 19 groups comprised a total of 52 small and medium size hydro power generation plants which were owned by state-owned power firm Elektrik Uretim A.S. (EUAS) and had a total capacity of 141 MW. A group had between one and five dams and were grouped based on their geographical proximity. The 19 groups were auctioned in by competitive bidding attracting 615 bids. The privatization process of most of the 19 groups concluded in 2011.

Original sector

Energy

Procurement method

Budget

Location

Country

Turkey

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Hydro, Power Generation (CCGT), Government, Manufacturing (Industrial)

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project