Bayburt Cemisgezek Girlevik HPPs - Group 14
Sector: Water Supply and Storage • Location: Turkey
Source: World Bank Group
On January 3thd 2011, the Turkish Privatization Administration (Ozellestirme Idaresi Baskanligi or OIB) signed with the Turkish industrial group Boydak a 49 years concession granting the operating rights of three mini hydro power plants, known as Group 14, with a total capacity of 3.552 MW. The total capacity of minihydro power plants was 0.396 MW Bayburt, 3.040 MW Girevlik and 0.116 MW Cemisgezek
- Status
- Prospective
- Sector
- Water Supply and Storage, Hydro, Power Generation (CCGT), Government, Manufacturing (Industrial)
- Location
- Turkey
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Bayburt Cemisgezek Girlevik HPPs - Group 14
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | On January 3thd 2011, the Turkish Privatization Administration (Ozellestirme Idaresi Baskanligi or OIB) signed with the Turkish industrial group Boydak a 49 years concession granting the operating rights of three mini hydro power plants, known as Group 14, with a total capacity of 3.552 MW. The total capacity of minihydro power plants was 0.396 MW Bayburt, 3.040 MW Girevlik and 0.116 MW Cemisgezek, located in Bayburt, Tunceli, and Erzincan, Turkey. The plants were transferred under the Transfer of Operating Rights (TOR) scheme for 49 years with no investment obligations to expand or rehabilitate the power plant. Based on this information, the project was classified as a lease contract in the PPI Database. The project was expected to sell electricity produced in the liberalized electricity market in Turkey. In May 2011, Boydak Energy Production Co. won the operating rights of Group 14 mini hydro plant in an open tender held by OIB by offering $56.08 million in the public auction. The tender of this power plant received 54 bids in total. The tender, which were conducted by competitive bidding , followed the sale of other groups over the past two weeks from the same tender that ended in February. Group 14 was one of the 19 groups comprising of small and medium hydro power plants which OIB tendered to private consortia in February 2010. The 19 groups comprised a total of 52 small and medium size hydro power generation plants which were owned by state-owned power firm Elektrik Uretim A.S. (EUAS) and had a total capacity of 141 MW. A group had between one and five dams and were grouped based on their geographical proximity. The 19 groups were auctioned in by competitive bidding attracting 615 bids. The privatization process of most of the 19 groups concluded in 2011. |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Turkey |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hydro, Power Generation (CCGT), Government, Manufacturing (Industrial) |
Article published date | 2024-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project