logo

Bayfair Pumping Plant Rehabilitation and Pipeline Replacement

Sector: Car parking • Location: San Leandro, California, United States of America

Source: East Bay Municipal Utility District

Project
Completed

Bayfair, South and Peralta Pumping Plant Project EBMUD will soon replace Bayfair Pumping Plant and will remove Peralta and South Pumping Plants as they have reached the end of their useful lives. A majority of the facilities are located at the end of Estudillo Avenue in Chabot Park in San Leandro (see map to the right). Replacement of these facilities and pipelines will ensure delivery of safe an

Project Information FAQ

Project Information

4 Q
The project “Bayfair Pumping Plant Rehabilitation and Pipeline Replacement” is an infrastructure initiative in the Car parking sector, located in San Leandro, California, United States of America. Taiyo aggregates data on it from East Bay Municipal Utility District.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Bayfair, South and Peralta Pumping Plant Project EBMUD will soon replace Bayfair Pumping Plant and will remove Peralta and South Pumping Plants as they have reached the end of their useful lives. A majority of the facilities are located at the end of Estudillo Avenue in Chabot Park in San Leandro (see map to the right). Replacement of these facilities and pipelines will ensure delivery of safe and reliable drinking water to your home. Project work includes: • Install a new 8-inch pipeline on Estudillo Avenue, from Benedict Drive to Graff Avenue • Replacement of the large diameter pipeline on Estudillo Avenue, from Collier Drive to Bayfair Pumping Plant • Demolish Peralta and South Pumping Plants and the Bayfair Regulator • Replacement of Bayfair Pumping Plant • Demolish May Pumping Plant at Golf Links Road and Grass Valley Blvd in Oakland. Relocate existing standby Peralta Regulator at the same site to inside of the May Pumping Plant building. Workplan and schedule: Construction of the 8-inch pipeline is complete. All other construction will be performed by an EBMUD contractor and is scheduled to begin in the fall of 2019 and will take approximately two years to complete. Typical work hours are Monday to Friday, 7:00 a.m. to 6:00 p.m. What to expect There will be water outages associated with the installation of pipelines. You will be notified by door hanger in advance of the outages. During construction, expect increased traffic to and from the site and construction related noise and dust. All Chabot Park parking will be temporarily closed on two occasions for one month each in the winter of 2019 and winter of 2020 as crews work on the large transmission pipeline at the park entrance. The park will remain open to foot traffic throughout the project. Contact information: Emergencies or after-hours, call EBMUD at 866-403-2683

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data