Bayo Canyon Lift Station Elimination REBID
One of 10,000+ projects Taiyo tracks in New Mexico.
Source: Dodge USA
The project consists of construction of approximately 2,700 feet of new 10-inch polyvinyl chloride (PVC) sewer line in an existing access road between the Bayo Canyon Lift Station and the Los Alamos WWTP. Prior to 2005, an existing gravity sewer line followed this same alignment to convey sewage to the old Bayo Wastewater Treatment Plant. The old Bayo WWTP was decommissioned and replaced with the
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial
- Location
- Los Alamos, New Mexico, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bayo Canyon Lift Station Elimination REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of construction of approximately 2,700 feet of new 10-inch polyvinyl chloride (PVC) sewer line in an existing access road between the Bayo Canyon Lift Station and the Los Alamos WWTP. Prior to 2005, an existing gravity sewer line followed this same alignment to convey sewage to the old Bayo Wastewater Treatment Plant. The old Bayo WWTP was decommissioned and replaced with the Los Alamos WWTP. As part of the construction of the new Los Alamos WWTP in 2003-2005 the old sewe... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Mexico |
City | Los Alamos |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
