Bayou Bridge Pipeline Project, Louisiana

Closed · United States

Source: Hydrocarbon Technology

The Bayou Bridge crude oil pipeline was constructed in Louisiana, US. Credit: Matthew Thorn. The Bayou Bridge pipeline is 262km-long and has a diameter of 24in. Credit: jasonwoodhead23. The Bayou Bridge pipeline was laid approximately 3ft underground. Credit: rebelxtned. The Bayou Bridge crude oil pipeline is a 262km-long extension of the existing 30in pipeline running between Nederland, Texas, an

Status
Closed
Sector
Bridge, Cement, Education, Hospital, Hotel, Manufacturing (Industrial), Oil and Gas, Steel, Warehouse, Water Supply and Storage, Raw Materials, Road, Metal
Location
United States of America
Updated
22 Jul 2026
Source
Hydrocarbon Technology

ConstructChat

Ask ConstructChat about Bayou Bridge Pipeline Project, Louisiana

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Bayou Bridge Pipeline Project, Louisiana” is an infrastructure initiative in the Bridge sector, located in United States. Taiyo aggregates data on it from Hydrocarbon Technology.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Bayou Bridge crude oil pipeline was constructed in Louisiana, US. Credit: Matthew Thorn. The Bayou Bridge pipeline is 262km-long and has a diameter of 24in. Credit: jasonwoodhead23. The Bayou Bridge pipeline was laid approximately 3ft underground. Credit: rebelxtned. The Bayou Bridge crude oil pipeline is a 262km-long extension of the existing 30in pipeline running between Nederland, Texas, and Lake Charles, Louisiana, US. The crude oil pipeline was developed by a joint venture (JV) between Energy Transfer Partners (ETP, 60%) and Phillips 66 Partners (40%). It was previously owned by a JV comprising Phillips 66 (40%), Energy Transfer (30%) and Sunoco Logistics (30%). The Bayou Bridge pipeline was developed with an estimated investment of $750m. Phase one of the pipeline entered service in April 2016, while the second phase was completed in April 2019. The pipeline will transport approximately 480,000 barrels a day of light and heavy crude oil to the St James terminal in the Gulf Coast region. The Bayou Bridge development comprises 260km (161.56 miles) of mainline and 2km (1.12 miles) of lateral line pipelines. It has a diameter of 24in and runs from Lake Charles in Calcasieu Parish to St James, Louisiana. The pipeline passes through the Calcasieu, Jefferson Davis, Acadia, Vermilion, Lafayette, Iberia, St Martin, Iberville, Ascension, Assumption, and St James parishes within the state of Louisiana. It also crosses eight watersheds located in Lower Calcasieu, Mermentau, Vermilion, Bayou Teche, Atchafalaya, Lower Grand, West Central Louisiana Coastal, and East Central Louisiana Coastal. The pipeline is made of 100% steel, which will be fabricated in Baton Rouge, Louisiana. The project involved the construction of two pump stations, as well as other necessary ancillary facilities. Its pump stations are located in the Jefferson Davis and St Martin parishes. The Bayou Bridge crude oil pipeline project was laid within a 100ft-wide right-of-way (ROW). It also includes a 50ft-wide permanent easement and a 50ft-wide temporary easement. The pipeline was laid in wetlands within a 75ft ROW. The majority of pipeline was laid approximately 3ft underground, although the depth was increased under wetlands, agricultural fields, roads and other delicate areas. It was laid parallel to existing infrastructure for approximately 88% of its length. The project used low-weight-bearing specialised equipment and materials during construction to prevent soil compaction and rutting. Pipeline was installed with buoyancy control devices and is coated with concrete. Its main valves within the wetland areas are installed and supported by piers to avoid infilling of water. The pipeline follows all relevant laws in accordance with the US Fish and Wildlife Service to ensure that construction does not threaten or endanger any species. The affected areas are scheduled to be restored to their previous contours and elevations following completion of the construction. The Stupp Corporation was responsible for fabricating the steel, as well as providing storage and transportation services for the pipes, while TRC Solutions supplied the required civil survey and engineering design services. Sunland Corporation carried out the construction of the pipeline across the Atchafalaya Basin, while Quality Marine Services supplied and operated airboats to support the project. The Bayou Bridge pipeline project created approximately 2,500 construction jobs. It will enable the efficient and environmentally friendly transportation of crude oil to North American refineries located along the Gulf Coast. The project is expected to generate total sales tax revenue of approximately $17.6m. The annual property tax paid by the developers is expected to support the local development of libraries, roads, hospitals, health departments and senior citizen centres.

Original sector

Pharmaceutical

Location

Country

United States of America (USA)

Source

Source reliability

High

Source

Hydrocarbon Technology

URL

More Details

Record type

Project

Sector

Bridge, Cement, Education, Hospital, Hotel, Manufacturing (Industrial), Oil and Gas, Steel, Warehouse, Water Supply and Storage, Raw Materials, Road, Metal

Article published date

2023-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project