Bayview Ave Mixed-use Building
Planning schematics · Ontario · Last reported May 2024
Source: Dodge USA
a 46-storey (156 metres to top of mechanical) mixed use building. The building will have approximately 384 square metres of retail uses at grade along Bayview Avenue. In total, 419 residential units are proposed for a GFA of 28,959 square metres, with a FSI of 20.5 times of the site area. 44 parking spaces are proposed within two levels of underground parking.
- Status
- Prospective
- Sector
- Car parking, Commercial, Residential, Automotive, Manufacturing (Industrial)
- Location
- Toronto, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bayview Ave Mixed-use Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | a 46-storey (156 metres to top of mechanical) mixed use building. The building will have approximately 384 square metres of retail uses at grade along Bayview Avenue. In total, 419 residential units are proposed for a GFA of 28,959 square metres, with a FSI of 20.5 times of the site area. 44 parking spaces are proposed within two levels of underground parking. |
Budget |
Location
Country | Canada |
State | Ontario |
City | Toronto |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Residential, Automotive, Manufacturing (Industrial) |
Article published date | 2024-07-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
