BBF Rondonia
Sector: Power Generation (CCGT) • Location: Brazil
Source: World Bank Group
The Brazilian company Brasil Bio Fuels was granted the authorization to build and operate ten biodiesel fueled power plants located in the state of Rondônia (5.27 MW in total capacity). The special purpose company BBF Rondonia Geracao de Energia Ltda was established to manage the following power plants:
UTE Calama (1.4 MW) UTE Conceicao da Galera (0.1 MW) UTE Demarcacao (0.2 MW) UTE Maici (0.07 M
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Brazilian company Brasil Bio Fuels was granted the authorization to build and operate ten biodiesel fueled power plants located in the state of Rondônia (5.27 MW in total capacity). The special purpose company BBF Rondonia Geracao de Energia Ltda was established to manage the following power plants: UTE Calama (1.4 MW) UTE Conceicao da Galera (0.1 MW) UTE Demarcacao (0.2 MW) UTE Maici (0.07 MW) UTE Nazare (0.6 MW) UTE Santa Catarina (0.2 MW) UTE Sao Carlos (1.4 MW) UTE Pedras Negras (0.2 MW) UTE Rolim de Moura do Guapore (0.6 MW) UTE Surpresa (0.6 MW) The 30-year authorization contract was granted by the regulatory agency ANEEL in August 2015. The construction works commenced in July 2016 and operations began in August 2016. The investment in this project is estimated at U$S 4.9 million (R$ 17.1 million). The government periodically runs public bidding for the sale of energy to the country´s distribution companies in the Northern region of the country. The sponsor won the public bidding that took place in June 2015 by offering an average tariff of US$ 435.3/MWh (BRL 1452/MWh), 8.88% below the ceiling established by Aneel. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
