BBNFH Underground Communications Line Replace
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Install approximately 750 linear feet of standard multimode full duplex fiber optic communications cable. Contractor to determine fiber specifications based on run length and site needs. Cable will be installed underground (point to point) with directional boring, with minor trench work as needed, of new cable in conduit. Terminate wiring with new termination boxes. Coordination with USFWS archaeo
- Status
- Closed
- Sector
- Telecommunications, Broadband, Manufacturing (Industrial), Commercial
- Location
- Wadmalaw Island, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about BBNFH Underground Communications Line Replace
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Install approximately 750 linear feet of standard multimode full duplex fiber optic communications cable. Contractor to determine fiber specifications based on run length and site needs. Cable will be installed underground (point to point) with directional boring, with minor trench work as needed, of new cable in conduit. Terminate wiring with new termination boxes. Coordination with USFWS archaeologists is required, as they will monitor the installation of the cable underground |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Wadmalaw Island |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Broadband, Manufacturing (Industrial), Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Telecommunications projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- INSTALL 1 FLAGPOLE,6 ANTENNAS,1 RADOME,3 POWER CABLES,3 HYBR D CABLES,JUMPERS FROM RRUS TO ANTENNAS,NEW 10'X10'LEASE..SEE
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- COLLOCATION OF (3)NEW ANTENNAS & ASSOCIATED CABLES & EQUIPMT PER ATTACHED SCOPE OF WORK. 6904 COMPLIANT AT&T (E)CELL SITE
