BC Hydro - Customer Connection Project: Copper Mountain Mine Trolley Assist

Sector: Water Supply and Storage • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
In Progress

BC Hydro’s customer, Copper Mountain Mining Corp., operates Copper Mountain mine in British Columbia near Princeton. Copper Mountain currently operates diesel haul trucks to transport ore or waste rock on the site. This contributes significantly to greenhouse gas emissions, especially when trucks are loaded and travel uphill. The customer is seeking to electrify haul trucks using a trolley assist

Status
Under Construction
Sector
Water Supply and Storage, Cable car, Hydro, Power Generation (CCGT), Metal, Government, Automotive
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about BC Hydro - Customer Connection Project: Copper Mountain Mine Trolley Assist

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “BC Hydro - Customer Connection Project: Copper Mountain Mine Trolley Assist” is an infrastructure initiative in the Water Supply and Storage sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

BC Hydro’s customer, Copper Mountain Mining Corp., operates Copper Mountain mine in British Columbia near Princeton. Copper Mountain currently operates diesel haul trucks to transport ore or waste rock on the site. This contributes significantly to greenhouse gas emissions, especially when trucks are loaded and travel uphill. The customer is seeking to electrify haul trucks using a trolley assist system. This system consists of electric wires suspended above a one kilometer ramp where loaded haul trucks drive from the open pit, connect to the wires by means of pantographs (overhead bars like those of city streetcars), drive one kilometer uphill on grid power, disconnect and drive a short distance to the primary crusher on diesel power to dump their load. The customer will replace several remotely located diesel-powered water pumps at the mine site with electrically powered pumps by extending the mine’s own network of electricity lines. The improvements to the transmission line not only supply BC Hydro’s customer, Copper Mountain, but also provide greater backup electricity supply to Princeton. Phase 2 of the project will complete the additional load required for adding more trolley assist at the mine site. The project will add approximately 12 MW and 3 km of trolley assist line. This will allow Copper Mountain to transport ore from their New Ingerbelle pit using trolley assist. The project will upgrade a BC Hydro power line that runs from Merritt to Princeton and serves the Copper Mountain substation supplying 16 megawatts of electricity: -replace 22 poles; -replace 138 kilovolt cable in a 4.5 km section of powerline with higher rated cable; -a series capacitor station; -replace existing 138 kilovolt cable in 10 km of powerline with cables of higher rating; -conduct vegetation clearing and access improvements along existing access routes; and -related works.

Original sector

Green Energy

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cable car, Hydro, Power Generation (CCGT), Metal, Government, Automotive

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project