BC Hydro - Customer Connection Project: Copper Mountain Mine Trolley Assist
Sector: Metal • Location: British Columbia, Canada
Source: Infrastructure Canada
BC Hydro’s customer, Copper Mountain Mining Corp., operates Copper Mountain mine in British Columbia near Princeton. Copper Mountain currently operates diesel haul trucks to transport ore or waste rock on the site. This contributes significantly to greenhouse gas emissions, especially when trucks are loaded and travel uphill. The customer is seeking to electrify haul trucks using a trolley assist
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | in progress |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | BC Hydro’s customer, Copper Mountain Mining Corp., operates Copper Mountain mine in British Columbia near Princeton. Copper Mountain currently operates diesel haul trucks to transport ore or waste rock on the site. This contributes significantly to greenhouse gas emissions, especially when trucks are loaded and travel uphill. The customer is seeking to electrify haul trucks using a trolley assist system. This system consists of electric wires suspended above a one kilometer ramp where loaded haul trucks drive from the open pit, connect to the wires by means of pantographs (overhead bars like those of city streetcars), drive one kilometer uphill on grid power, disconnect and drive a short distance to the primary crusher on diesel power to dump their load. The customer will replace several remotely located diesel-powered water pumps at the mine site with electrically powered pumps by extending the mine’s own network of electricity lines. The improvements to the transmission line not only supply BC Hydro’s customer, Copper Mountain, but also provide greater backup electricity supply to Princeton. Phase 2 of the project will complete the additional load required for adding more trolley assist at the mine site. The project will add approximately 12 MW and 3 km of trolley assist line. This will allow Copper Mountain to transport ore from their New Ingerbelle pit using trolley assist. The project will upgrade a BC Hydro power line that runs from Merritt to Princeton and serves the Copper Mountain substation supplying 16 megawatts of electricity: -replace 22 poles; -replace 138 kilovolt cable in a 4.5 km section of powerline with higher rated cable; -a series capacitor station; -replace existing 138 kilovolt cable in 10 km of powerline with cables of higher rating; -conduct vegetation clearing and access improvements along existing access routes; and -related works. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |