BC Hydro - Customer Connection Project: Copper Mountain Mine Trolley Assist

Sector: Metal • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
In Progress

BC Hydro’s customer, Copper Mountain Mining Corp., operates Copper Mountain mine in British Columbia near Princeton. Copper Mountain currently operates diesel haul trucks to transport ore or waste rock on the site. This contributes significantly to greenhouse gas emissions, especially when trucks are loaded and travel uphill. The customer is seeking to electrify haul trucks using a trolley assist

Project Information FAQ

Project Information

5 Q
The project “BC Hydro - Customer Connection Project: Copper Mountain Mine Trolley Assist” is an infrastructure initiative in the Metal sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

BC Hydro’s customer, Copper Mountain Mining Corp., operates Copper Mountain mine in British Columbia near Princeton. Copper Mountain currently operates diesel haul trucks to transport ore or waste rock on the site. This contributes significantly to greenhouse gas emissions, especially when trucks are loaded and travel uphill. The customer is seeking to electrify haul trucks using a trolley assist system. This system consists of electric wires suspended above a one kilometer ramp where loaded haul trucks drive from the open pit, connect to the wires by means of pantographs (overhead bars like those of city streetcars), drive one kilometer uphill on grid power, disconnect and drive a short distance to the primary crusher on diesel power to dump their load. The customer will replace several remotely located diesel-powered water pumps at the mine site with electrically powered pumps by extending the mine’s own network of electricity lines. The improvements to the transmission line not only supply BC Hydro’s customer, Copper Mountain, but also provide greater backup electricity supply to Princeton. Phase 2 of the project will complete the additional load required for adding more trolley assist at the mine site. The project will add approximately 12 MW and 3 km of trolley assist line. This will allow Copper Mountain to transport ore from their New Ingerbelle pit using trolley assist. The project will upgrade a BC Hydro power line that runs from Merritt to Princeton and serves the Copper Mountain substation supplying 16 megawatts of electricity: -replace 22 poles; -replace 138 kilovolt cable in a 4.5 km section of powerline with higher rated cable; -a series capacitor station; -replace existing 138 kilovolt cable in 10 km of powerline with cables of higher rating; -conduct vegetation clearing and access improvements along existing access routes; and -related works.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data