BC Hydro’s customer, Creative Energy, is the owner and operator of one of the largest district energy systems in North America. Creative Energy’s steam plant at 720 Beatty Street in Vancouver, British Columbia, operates by burning natural gas in six industrial steam boilers. Responding to local, national and global greenhouse gas (GHG) reduction targets and aspirations, Creative Energy plans to re

Status
Under Construction
Sector
Power Generation (CCGT), Hydro, Natural Gas, Manufacturing (Industrial), Road
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about BC Hydro - Customer Connection Project: Creative Energy Decarbonization

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “BC Hydro - Customer Connection Project: Creative Energy Decarbonization” is an infrastructure initiative in the Power Generation (CCGT) sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

BC Hydro’s customer, Creative Energy, is the owner and operator of one of the largest district energy systems in North America. Creative Energy’s steam plant at 720 Beatty Street in Vancouver, British Columbia, operates by burning natural gas in six industrial steam boilers. Responding to local, national and global greenhouse gas (GHG) reduction targets and aspirations, Creative Energy plans to reconfigure its plant to install new electric steam boilers. Powered by clean energy through a new underground power line connected to BC Hydro’s electricity grid, the decarbonization project would avoid emissions from Creative Energy’s system by approximately 48,600 tonnes of CO2e and provide low-carbon energy for 12 million square feet of new development—equivalent to all of the development in downtown Vancouver for the foreseeable future. The BC Hydro Customer Connection Project: Creative Energy Decarbonization (the project) includes the design and construction of an approximately 1.2 km long underground power line from BC Hydro’s Murrin substation in Chinatown to the Beatty Street plant. This will enable BC Hydro to supply Creative Energy with 30 megawatts (MW) of clean and renewable electricity. To connect Creative Energy to BC Hydro’s electrical grid the following work is required: -design and construction of a new 60 kilovolt underground power line from BC Hydro’s Murrin substation to Creative Energy’s plant at 720 Beatty Street-the line will be approximately 1.2 km in length; -construction of new duct bank; -installation of a circuit breaker and surge arrester at the Murrin substation; and -protection and control work at the Murrin substation.

Original sector

Green Energy

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydro, Natural Gas, Manufacturing (Industrial), Road

Article published date

2026-06-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project