BC Hydro - Customer Connection Project: Creative Energy Decarbonization

Source: Infrastructure Canada

Project
In Progress

BC Hydro’s customer, Creative Energy, is the owner and operator of one of the largest district energy systems in North America. Creative Energy’s steam plant at 720 Beatty Street in Vancouver, British Columbia, operates by burning natural gas in six industrial steam boilers. Responding to local, national and global greenhouse gas (GHG) reduction targets and aspirations, Creative Energy plans to re

Project Information FAQ

Project Information

5 Q
The project "BC Hydro - Customer Connection Project: Creative Energy Decarbonization" is an infrastructure initiative in the Hydro, Natural Gas, Manufacturing (Industrial), Power Generation (CCGT), Road, Government sector, located in N/A, Canada. Taiyo aggregates data from Infrastructure Canada, including information on sponsoring government bodies, EPCs, and contractors.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

BC Hydro’s customer, Creative Energy, is the owner and operator of one of the largest district energy systems in North America. Creative Energy’s steam plant at 720 Beatty Street in Vancouver, British Columbia, operates by burning natural gas in six industrial steam boilers. Responding to local, national and global greenhouse gas (GHG) reduction targets and aspirations, Creative Energy plans to reconfigure its plant to install new electric steam boilers. Powered by clean energy through a new underground power line connected to BC Hydro’s electricity grid, the decarbonization project would avoid emissions from Creative Energy’s system by approximately 48,600 tonnes of CO2e and provide low-carbon energy for 12 million square feet of new development—equivalent to all of the development in downtown Vancouver for the foreseeable future. The BC Hydro Customer Connection Project: Creative Energy Decarbonization (the project) includes the design and construction of an approximately 1.2 km long underground power line from BC Hydro’s Murrin substation in Chinatown to the Beatty Street plant. This will enable BC Hydro to supply Creative Energy with 30 megawatts (MW) of clean and renewable electricity. To connect Creative Energy to BC Hydro’s electrical grid the following work is required: -design and construction of a new 60 kilovolt underground power line from BC Hydro’s Murrin substation to Creative Energy’s plant at 720 Beatty Street-the line will be approximately 1.2 km in length; -construction of new duct bank; -installation of a circuit breaker and surge arrester at the Murrin substation; and -protection and control work at the Murrin substation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data